Guralp-systems CMG-1T Manual do Utilizador Página 31

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 34
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 30
Operator’s Guide CMG-1T Ocean Bottom
Seismometer
September, 1999, Issue C Section 9,
Page 1
9. MOUNTING OF THE LEVELLING SYSTEM
Three fixing bolt positions are provided to fix the levelling system within a
pressure housing, as shown in the diagram.
The positions of the mounting holes are given in the following drawings
together with a suggested method of electrically isolating the levelling system
from it’s casing.
Vista de página 30
1 2 ... 26 27 28 29 30 31 32 33 34

Comentários a estes Manuais

Sem comentários